Project Planning for the Renovation of a Mall

0
1986
Project planning for the renovation of a mall

Project Planning for the Renovation of a Mall

Introduction

A company has come up with a Project Planning for the renovation of mall renovation in a specified time period. The conditions being optimal utilization of resources and producing quality construction. In this study, the pedestrian simulation VISWALK integration and application platform ant algorithms written program made to construct a renovation engineering schedule planning mode.

The use of simulation analysis platform construction site when the user running the simulation, after calculating the user walks in the case of construction delays, the ant algorithm to find out the minimum delay time schedule plan, and add volume and unit area deactivated loss of business computing, and finally to the owners and users of two different positions cut considerations pick out the best schedule planning. This paper aimed to help the quality and cost management of the shopping mall projects by ensuring the timely and cost-efficient progress of the construction in consideration of the subsequent construction duration through the improvement on the management of the framework construction for a shopping mall projects.

Project Name :Project Planning for the Renovation of a Mall
Project Category : MBA Project Management
Pages Available : 55-65/pages
Project PPT cost : Rs 500/ $10
Project Synopsis : Rs 500/ $10
Project Cost : Rs 1999/$ 30
Delivery Time : within 12 Hours
For Support : Click on this link to Chat us Directly on WhatsApp: https://wa.me/+919481545735 or
  Email: info@partheniumprojects.com